15 points parkgraph 3 hours ago 8 comments
bluGill 1 hour ago | parent
gizmo686 48 minutes ago | parent
1) four CCS ports 2) 150 kW each 3) within 1 mile of a designated corridor
1 is worth something, but not much as the industry has been migrating to NACS. When I bought my used CCS car, it came with a fast-charge NACS->CCS converter, so dealing with a NACS charger is not that big of a deal. Requiring 4 ports in general is a more useful standardad. The data does keep a seperate count of dc fast ports, so you could check for 4 ports if you want to, but the pass/fail does not consider non-ccs ports.
2 is reasonable.
3 is just a sign that you are completly mis-applying the standard. Probably because you are a computer.
Rebelgecko 1 hour ago | parent
One of the criteria is "it's within a mile of certain designated freeways". Obviously it's good to have chargers along those freeways, but as long as there's a certain level of coverage it's not a bad thing if there are ALSO lots of chargers along different freeways, highways, at neighborhood gas stations, etc.
Another criteria is "at least 4 CCS chargers". Since CCS is on its way out, that also seems kinda unnecessary. I have an NACS adapter for my car, so as long as there's open chargers I don't really care what the form factor is (as long as they're fast and not chademo). However 4+ chargers in general is a good criteria. I avoid rest stops that only have 1-2 chargers because it's a crapshoot if they'll be available
tencentshill 1 hour ago | parent
parkgraph 45 minutes ago | parent
dyauspitr 45 minutes ago | parent
parkgraph 39 minutes ago | parent
gizmo686 26 minutes ago | parent
As to every gas station having a fast charger; the answer is probably never. I doubt that the EV economy would ever be able to support that number of fast charging stations.
Consider that with ICE cars, approximatly every mile driven is powered by gas from a gas station. With EVs, a significant amount of miles driven is powered by residential electricity. Many more miles driven can be powered by slow destination chargers (e.g. at workplaces). This means that the addressable market of fast charges are: A) long road trips, and B) people without convenient access to slow chargers.
In addition to that, most fast chargers are just plopped onto random shopping center parking lots. The needed infastructure is just space, and a large enough grid connection.